Phase IA
Phase IA Runway 11/29 grading and site work, which work shall include: the removal and salvage of existing FAA utilities, ILS, ILS approach lighting, VOR, Localizer, weather system and related structures. Partial milling of existing Runway 12/30 and taxiways. The removal and salvage of existing runway lights, taxiway lights and signs. Runway 11/29 grading from STA ± -2+00, 250' left to 470' left and form STA 34+50 to ±70+50 right and left. The grading of 35' wide parallel and connector taxiways. Installation of subbase course, underdrain piping and related construction.

Construction Completion Limitations

  • May 10, 2013 – Construction Plans, Specifications, and Contract Documents
  • August 31, 2013 – Schedule B (BMU) substantial completion time extension (previously August 16, 2013)
  • November 15, 2013 – Schedule A (Airport) substantial completion time extension (previously August 16, 2013)
  • November 15, 2013 – Substantial completion
  • November 30, 2013 – Final completion

Contractor:  Loiseau Construction Inc.